great-loop@lists.trawlering.com

Cruising America's Great Loop and other inland routes

View all threads

Dock construction

F
fred@tug44.org
Sat, Apr 6, 2013 7:18 PM

Doing some finishing touches on the dock, just completed the electric post.
There's a 30 amp and a duplex 20.  I'm keeping the original breaker box
nearby.

See the last photo on this page:

http://www.tug44.org/winter.maintenance/dock-construction/

All I need now is water ... soon, I hope.

Fred
Tug 44

Doing some finishing touches on the dock, just completed the electric post. There's a 30 amp and a duplex 20. I'm keeping the original breaker box nearby. See the last photo on this page: http://www.tug44.org/winter.maintenance/dock-construction/ All I need now is water ... soon, I hope. Fred Tug 44
BV
B. Victhom
Sun, Apr 7, 2013 3:06 PM

Fred

Great job ! How much are the annual dock fees from NY Canals ?

Thanks

Doing some finishing touches on the dock, just completed the electric post.
There's a 30 amp and a duplex 20.  I'm keeping the original breaker box
nearby.

Fred Great job ! How much are the annual dock fees from NY Canals ? Thanks > Doing some finishing touches on the dock, just completed the electric post. > There's a 30 amp and a duplex 20. I'm keeping the original breaker box > nearby. >