WE HAVE SUNSET THIS LISTSERV - Join us at collectionspace@lyrasislists.org
View all threadsHi all,
JIRA has been updated. It took me a little longer than expected to run
a few tests to make sure the installation was complete. If you come
across anything broken or missing then please let me know.
Thank you for your patience,
On Fri, Jan 27, 2012 at 2:40 PM, Jesse Martinez
jmartinez@movingimage.us wrote:
In order to upgrade, JIRA will be shutdown in 20 mins. Please save any
unsaved tasks.
Thank you,
- Jesse
On Fri, Jan 27, 2012 at 10:06 AM, Jesse Martinez
jmartinez@movingimage.us wrote:
On Wed, Jan 25, 2012 at 4:27 PM, Jesse Martinez
jmartinez@movingimage.us wrote:
Hi All,
I am scheduling a necessary upgrade to our JIRA instance at
issues.collectionspace.org. This JIRA upgrade will allow us to better
integrate with our existing continuous integration server, Bamboo; our
repository viewer, Fisheye, and our wiki, Confluence. Additionally,
this upgrade will provide needed security upgrades to our JIRA
instance.
Scheduled time: 3pm EST on Friday January 27, 2012.
The time required for this upgrade should be no longer than 1.5 hours.
Please let me know if there are any questions or concerns about this process.
Thanks,
- Jesse