Hi All,
I am scheduling a necessary upgrade to our JIRA instance at
issues.collectionspace.org. This JIRA upgrade will allow us to better
integrate with our existing continuous integration server, Bamboo; our
repository viewer, Fisheye, and our wiki, Confluence. Additionally,
this upgrade will provide needed security upgrades to our JIRA
instance.
Scheduled time: 3pm EST on Friday January 27, 2012.
The time required for this upgrade should be no longer than 1.5 hours.
Please let me know if there are any questions or concerns about this process.
Thanks,
Hi All,
I am scheduling a necessary upgrade to our JIRA instance at
issues.collectionspace.org. This JIRA upgrade will allow us to better
integrate with our existing continuous integration server, Bamboo; our
repository viewer, Fisheye, and our wiki, Confluence. Additionally,
this upgrade will provide needed security upgrades to our JIRA
instance.
Scheduled time: 3pm EST on Friday January 27, 2012.
The time required for this upgrade should be no longer than 1.5 hours.
Please let me know if there are any questions or concerns about this process.
Thanks,
- Jesse