talk@lists.collectionspace.org

WE HAVE SUNSET THIS LISTSERV - Join us at collectionspace@lyrasislists.org

View all threads

JIRA upgrade scheduled for Friday January 27, 2012 at 3pm EST

JM
Jesse Martinez
Wed, Jan 25, 2012 9:27 PM

Hi All,

I am scheduling a necessary upgrade to our JIRA instance at
issues.collectionspace.org. This JIRA upgrade will allow us to better
integrate with our existing continuous integration server, Bamboo; our
repository viewer, Fisheye, and our wiki, Confluence. Additionally,
this upgrade will provide needed security upgrades to our JIRA
instance.

Scheduled time: 3pm EST on Friday January 27, 2012.

The time required for this upgrade should be no longer than 1.5 hours.

Please let me know if there are any questions or concerns about this process.

Thanks,

  • Jesse
Hi All, I am scheduling a necessary upgrade to our JIRA instance at issues.collectionspace.org. This JIRA upgrade will allow us to better integrate with our existing continuous integration server, Bamboo; our repository viewer, Fisheye, and our wiki, Confluence. Additionally, this upgrade will provide needed security upgrades to our JIRA instance. Scheduled time: 3pm EST on Friday January 27, 2012. The time required for this upgrade should be no longer than 1.5 hours. Please let me know if there are any questions or concerns about this process. Thanks, - Jesse