REQUEST FOR QUALIFICATIONS: MUSIC & AUDIO FEASIBLITY STUDY
STart, the Sound Transit Art Program, is considering producing a recorded music and audio program to build connections between cultures and generations in South King County.
In order to make an informed decision, STart is seeking a consultant to conduct a feasibility study that makes recommendations about options for recording in studios and on-location, digital distribution methodologies, and program structure, along with identifying related costs associated with a music and audio program aimed at people who ride Sound Transit trains.
PROJECT MANAGER - PUBLIC ART
STart, Sound Transit's Art Program is hiring a third project manager. The posting went up on the Sound Transit Jobs site late last week.
It will be advertised until we have a sufficient pool of candidates., we are estimating it will be open about 3 weeks.
Please let us know if you have candidates in mind, or any questions.
Applications are through the Project Manager link below, not through the Art Program.
ST Job Openings Site:
https://www.soundtransit.org/get-to-know-us/jobshttps://nam03.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.soundtransit.org%2Fget-to-know-us%2Fjobs&data=01%7C01%7Cmylinda.sneed%40soundtransit.org%7C6ec7cf78f0914182c1f108d732eaceed%7Cca24b0afd8fb4e629ead8b37062261d0%7C1&sdata=s2u2%2BBgbl7Vtdl2LSrE80P94GyYCLeAA1YxyiX1YMsk%3D&reserved=0
STart Project Manager job description:
https://recruiting.ultipro.com/SOU1036SOUND/JobBoard/dcc5dbea-875e-4cd1-bfd2-8e046cecc54f/OpportunityDetail?opportunityId=7fd6651a-3420-4fb8-8626-88e46300414f
REQUEST FOR QUALIFICATIONS: MUSIC & AUDIO FEASIBLITY STUDY
STart, the Sound Transit Art Program, is considering producing a recorded music and audio program to build connections between cultures and generations in South King County.
In order to make an informed decision, STart is seeking a consultant to conduct a feasibility study that makes recommendations about options for recording in studios and on-location, digital distribution methodologies, and program structure, along with identifying related costs associated with a music and audio program aimed at people who ride Sound Transit trains.
The Feasibility Study Consultant could be an individual or a team, artist, arts administrator, program manager, other creative, or an organization.
LEARN MORE & APPLY<https://www.soundtransit.org/sites/default/files/documents/federal-way-link-extension-rfq-feasibility-music-audio-2019.pdf>
---
PROJECT MANAGER - PUBLIC ART
STart, Sound Transit's Art Program is hiring a third project manager. The posting went up on the Sound Transit Jobs site late last week.
It will be advertised until we have a sufficient pool of candidates., we are estimating it will be open about 3 weeks.
Please let us know if you have candidates in mind, or any questions.
Applications are through the Project Manager link below, not through the Art Program.
ST Job Openings Site:
https://www.soundtransit.org/get-to-know-us/jobs<https://nam03.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.soundtransit.org%2Fget-to-know-us%2Fjobs&data=01%7C01%7Cmylinda.sneed%40soundtransit.org%7C6ec7cf78f0914182c1f108d732eaceed%7Cca24b0afd8fb4e629ead8b37062261d0%7C1&sdata=s2u2%2BBgbl7Vtdl2LSrE80P94GyYCLeAA1YxyiX1YMsk%3D&reserved=0>
STart Project Manager job description:
https://recruiting.ultipro.com/SOU1036SOUND/JobBoard/dcc5dbea-875e-4cd1-bfd2-8e046cecc54f/OpportunityDetail?opportunityId=7fd6651a-3420-4fb8-8626-88e46300414f