Cruising America's Great Loop and other inland routes
View all threadsFred asked me to send this on to the list. Elaine
From: "fred@tug44.org" fred@tug44.org
Sent: Saturday, March 02, 2013 5:16 PM
To: "Great Loop List" great-loop@lists.trawlering.com
Subject: Dock Construction Project
I'm making good progress on my dock project. That is in spite of the 6 inches of pudding-like muck on the bottom. Must get it done before it gets any warmer, when there will be no bottom at all.
All the planks in the photo are bolted to the pilings with 1/2" galvanized bolts, but not yet tightened down. Once that's done It'll be all straight.
Here's the latest progress photo:
http://www.tug44.org/dock1.jpg
Fred
Tug 44
http://www.tug44.org/
Fred, you put Pudding in the muck on the bottom?
From: ELReib@comcast.net
Date: Sat, 2 Mar 2013 18:13:33 -0500
To: great-loop@lists.trawlering.com
Subject: GL: Fwd: Dock Construction Project
Fred asked me to send this on to the list. Elaine
From: "fred@tug44.org" fred@tug44.org
Sent: Saturday, March 02, 2013 5:16 PM
To: "Great Loop List" great-loop@lists.trawlering.com
Subject: Dock Construction Project
I'm making good progress on my dock project. That is in spite of the 6 inches of pudding-like muck on the bottom. Must get it done before it gets any warmer, when there will be no bottom at all.
All the planks in the photo are bolted to the pilings with 1/2" galvanized bolts, but not yet tightened down. Once that's done It'll be all straight.
Here's the latest progress photo:
http://www.tug44.org/dock1.jpg
Fred
Tug 44
http://www.tug44.org/
http://lists.trawlering.com/mailman/listinfo/great-loop_lists.trawlering.com
To modify your Great-Loop subscription options (change email address,
unsubscribe, etc.) go to: http://lists.trawlering.com/mailman/options/great-loop_lists.trawlering.com